(850) 639-9272 Commercial & Industrial Insulation Mon-Fri, 7:30 AM to 3:30 PM · Free Commercial Estimates Get a Free Estimate Service Areas
Building type

Cold Storage Insulation

We install and reseal cold storage insulation in the walls and ceilings of freezers, coolers, and refrigerated warehouse space, on new cold storage and existing rooms. A retrofit turns on handback: the room usually comes out of service, so product is cleared from the zone, and we work section by section, resealing each one so the space can return to temperature.

Cold storage facility with continuous thermal and vapor barriers
Commercial & Industrial ProjectsWritten estimatesNew Construction & RetrofitMultiple Insulation Systems
Work included

What our cold storage insulation work includes

  • Freezer and cooler walls. Closed-cell foam or an insulated metal panel system keeps low vapor permeance and continuous coverage across the wall, since even a small vapor gap lets moisture migrate into the assembly and freeze.
  • Ceiling and roof over refrigerated space. Insulated panel systems above a freezer or cooler control both heat transfer and vapor migration from the warmer space above.
  • Panel seams and penetrations. Sealing at every panel joint and pipe or conduit penetration is what keeps the vapor retarder continuous rather than leaving small gaps across the wall or ceiling.
  • Freezer floor and slab edge. Insulation below and around the slab edge works alongside a separate under-slab heating or ventilation system to manage the temperature difference at ground level.
Closed-cell spray foam insulation on a metal building assembly
Suitable facilities

Facilities we work in

Freezers, coolers, and refrigerated warehouse space, on new cold storage construction and in existing rooms.

Projects we scope differently

  • A frost heave problem under an existing freezer floor is not solved by wall or ceiling insulation; that is a structural and mechanical issue involving the under-slab heating or ventilation system, which is a separate design decision from insulation.
  • Open-cell spray foam is not suited to cold storage vapor control, since it is vapor permeable rather than a vapor retarder; a closed-cell system or an insulated metal panel system is used instead where a freezer or cooler needs to keep moisture out.
  • A dock or staging area kept only mildly cool, rather than refrigerated, does not need the same vapor retarder detailing as a true freezer or cooler; that space is closer to a standard warehouse insulation job.
Representative warehouse and distribution facilities
New construction and retrofit

New construction and retrofit coordination

On new construction. On new cold storage construction, wall and ceiling insulation is typically built as an insulated metal panel system installed as the structure goes up, with panel joints sealed continuously as each section is set. The vapor retarder is placed on the warm side of the assembly by design, following the panel manufacturer's installation sequence. Freezer floor insulation and any under-slab heating or ventilation system are coordinated with the structural and mechanical trades before the slab is poured, since that system addresses frost heave separately from the wall and ceiling work.

In an existing building. In an existing cooler or freezer retrofit, the refrigerated space usually has to come out of service for the work, since panels and seals are being opened or replaced from inside a small, cold room. Work proceeds section by section, with each panel or wall segment resealed before moving to the next, so the space can be brought back down to temperature as soon as possible. Floor-level frost heave issues found during a retrofit are flagged separately, since correcting them involves the under-slab system rather than the wall and ceiling insulation.

Air-sealing a commercial building envelope
Project requirements

Access, phasing, and safety on site

  • Access. Reaching cold storage wall and ceiling panels usually means working from inside the refrigerated room itself, a small, cold space with limited room to stage material and equipment compared to open warehouse work.
  • Phasing. Retrofits proceed wall section by wall section or panel by panel, resealing each part before moving on, so the space can return to temperature as soon as possible rather than staying open and out of service longer than necessary.
  • Safety. Working inside an active or partially shut down freezer or cooler means managing cold-temperature exposure for the crew, in addition to the usual work-at-height considerations for taller cold storage ceilings.
Distribution center envelope with insulated roof deck and walls
Why Insulation Company

Why project teams choose Insulation Company

On many projects this work is scoped alongside metal building insulation, and one written estimate can cover both.

  • The commercial and industrial division of Polar Insulation, headquartered in Wewahitchka, FL
  • New construction and retrofit work, for contractors, developers, owners, and facility teams
  • A written estimate before any work is scheduled
  • Proposals include a W-9, state contractor licensing details, and a certificate of insurance
Project team reviewing commercial insulation plans and estimates
Estimate and installation

From estimate to installation

Send drawings or photos and the building address. The price is built from wall and ceiling area, new construction versus retrofit, and number of penetrations. The written estimate names the system, the coverage area, the R-value target, any removal, and the schedule.

  1. Assess the existing assembly. We review the wall and ceiling panel system, or the construction drawings for new work, to identify the vapor retarder location and any existing gaps at seams or penetrations.
  2. Coordinate the shutdown or work window. For a retrofit, we confirm with facility management how much of the room can come out of service at a time and for how long.
  3. Set up inside the cold room. Material and equipment are staged inside or just outside the refrigerated space, working around the room's limited size and its cold temperature.
  4. Install or reseal panels section by section. Wall and ceiling panels are installed or resealed one section at a time, keeping the vapor retarder continuous across each seam and penetration as work proceeds.
  5. Seal every penetration. Refrigeration lines, lighting, sprinkler heads, and conduit penetrations are sealed individually so the vapor barrier does not have a gap at any of these points.
Get a Free Estimate
Reviewing a commercial facility for an insulation project
FAQ

Questions from facility and project teams

Is open-cell spray foam used in cold storage walls?+

Generally no. Open-cell foam is vapor permeable and is not suited to cold storage vapor control, since a freezer or cooler wall needs a low-permeance retarder to keep moisture out. Closed-cell foam or an insulated metal panel system is used instead.

Does a cold storage retrofit require shutting down the whole room?+

Often the room needs to come out of service, at least in the section being worked, since panels and seals are opened from inside the refrigerated space. Work is typically staged section by section to limit how long the room stays out of service.

What do you need to price a cold storage insulation project?+

Drawings or photos, the building address, and the areas involved. The estimate turns on wall and ceiling area, new construction versus retrofit, and number of penetrations.

Get an estimate

Planning a cold storage insulation project?

Send the building type, location, approximate size, and what needs to be insulated. We review the details and follow up with next steps.

Prefer to call? (850) 639-9272

Free Estimate

Get a Free Estimate

Tell us what kind of building you're working on and what you need done. We'll review the details and get back to you. Fields marked are required.

By submitting, you agree to be contacted about your commercial or industrial project. We do not sell your information. Message and data rates may apply.

Call NowGet a Free Estimate